Origin-Destination Study

May 14th, 2014

Origin-Destination Study and Travel Pattern Study (Timmins, ON)

Project CastleGlenn Consultants Inc. was retained by the City of Timmins and Ministry of Transportation of Ontario (MTO) to undertake a Travel Pattern Survey to achieve the following objectives: Determine the proportion and composition (vehicle type) of existing traffic that, if constructed, would likely use a by-pass of the urban area of the City of […]

May 7th, 2014

Woodroffe Avenue Reconstruction Traffic Control Plans (Ottawa, ON)

Project Castleglenn Consultants Inc., in associate with J.L. Richards and Associates Ltd. were retained by the City of Ottawa to produce detailed Traffic Control Plans (TCP) required for the watermain replacement and the reconstruction of Woodroffe Avenue, between Highway 417 and Baseline Road. The project consisted of: A detailed analysis of traffic operations under multiple […]

May 7th, 2014

Prince of Wales Culvert Replacement (Ottawa, ON)

Project CastleGlenn Consultants Inc., in associate with J.L. Richards and Associates Ltd. were retained by the City of Ottawa to produce detailed Traffic Control Plans (TCP) required for the renewal of two bridge culverts located along Prince of Wales Drive about 0.55 km south of Merivale Road (SN117600) and (SN117640) located 0.15 km south of […]