Project CastleGlenn consultants was retained by Alberta Transportation to identify a potential correlation between potential bypass solutions and lower tier highway service level classifications (Levels 2, 3 and 4). The purpose of this discussion paper was to: identify what factors should be considered, what technical methodologies should be applied and what processes should be implemented […]
Alberta
HWY 22X – Functional Planning Study (Indus, AB)
Project CastleGlenn Consultants was retained by Alberta Transportation to conduct the Highway 22X/Highway 791 Functional Planning Study for a section of Highway 22X between the East Calgary Freeway and Range Road 273. This study addressed the “ultimate” requirements of the Highway 22X corridor including the preferred Highway 22X twinned alignment, provision for an 8-lane cross-section […]
HWY 1 – Springbank Interchange Functional Planning Study (Calgary, AB)
Project CastleGlenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would determine the “ultimate” configuration of the Highway 1/Range Road 33 interchange and confirm the access management strategy for Range Road 33 (between Twp Rd 250 and Twp Rd 245). The planning study was initiated in response to a […]