Project The objective of this functional design / planning study was to ascertain the most appropriate strategy for rehabilitating the Maitland Avenue Bridge over Highway 417. The strategy was to take into account future impacts such as the advent of Highway 416, the future widening of Highway 417 and the potential to achieve other improvements […]
Detailed Designs
Brookdale Mall Scotiabank Retail Development (Cornwall, ON)
Project The Bank of Nova Scotia retained CastleGlenn Consultants to investigate the feasibility of implementing a double-drive-through ATM for the Brookdale Mall, in Cornwall, Ontario. The assessment dealt with: A potential discrepancy between the architects drawing files and existing conditions; The required width to accommodate dual ATM operation; Conformance to the City of Cornwall Zoning […]
The Ottawa Hospital General Campus (Ottawa, ON)
Project Castleglenn Consultants was retained to determine the traffic impacts and the parking requirements associated with the major expansions of The Ottawa Hospital facilities including: the Ottawa Regional Cancer Centre; the Critical Care Tower; the Eye Institute; the Regional Lab; the Ottawa Hospital Research Institute (OHRI); the Ottawa Regional Cancer Centre shell; the Children’s Hospital […]
HWY 855 – Alignment Functional Planning study (Athabasca, AB)
Project Alberta Transportation had initiated a functional planning study in 2009 to address the requirements of the Highway 855:24 corridor (30km in length) between Highway 663 (Caslan) and Highway 55 (Atmore). The functional plan evaluated alternative Highway 855 alignment options and recommended future improvements. The existing Highway 855 corridor does not meet minimum highway design […]
HWY 783 – Functional Planning Study (Okotoks, AB)
Project Castleglenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would address the “ultimate” requirements of a 3.2km section of Highway 783 beginning south of Highway 7 (in the vicinity of the Town of Okotoks). The primary objectives of this planning study were to identify the preferred alignment and […]
HWY 63 – Combined Median Facility (Charron Lake, AB)
Project Castleglenn Consultants Inc. was retained in December 2009 to undertake consulting engineering services to evaluate, assess, and recommend a design and preferred location for a combined vehicle inspections station, truck staging area and truck safety rest area within the centre median of the Highway 63 corridor. The iterative design process involved an evaluation and […]
HWY 27 – Functional Planning Study (Olds, AB)
Project Castleglenn Consultants was retained by Alberta Transportation to conduct the Highway 27 Functional Planning Study. This study addressed the “ultimate” requirements of the Highway 27 corridor in the vicinity of the Town of Olds. Phase I: Corridor Planning focused on identifying a preferred interchange location along the Highway 2 corridor and identifying, reviewing and […]
HWY 43 – Functional Planning Study (Onoway, AB)
Project Alberta Transportation retained Castleglenn Consultants to conduct a study of Highway 43:22 to address the “ultimate” freeway requirements for a 23 km segment of Highway 43 and identify the configuration and location of future interchanges along the corridor. The proposed improvements were designed in accordance with AT’s “Best Practice For Planning and Design of […]
HWY 1 – Springbank Interchange Functional Planning Study (Calgary, AB)
Project CastleGlenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would determine the “ultimate” configuration of the Highway 1/Range Road 33 interchange and confirm the access management strategy for Range Road 33 (between Twp Rd 250 and Twp Rd 245). The planning study was initiated in response to a […]