HWY 2 – Gaetz Avenue Interchange Public Involvement Program (Red Deer, AB)

Project Castleglenn Consultants was retained by Alberta Transportation to assist with a public involvement program used to unite public support regarding the recommended improvements to the Highway 2 Gaetz Avenue interchange and Gasoline Alley corridor. CastleGlenn consultants undertook the following tasks: Review of the functional plans proposed by AECOM for the section of Highway 2 between the […]

May 15th, 2014

Infrastructure Needs Background and Sustainable Community Planning Study – Transportation Component (North Bay, ON)

Project Castleglenn Consultants Inc. was retained by the City of North Bay to undertake a comprehensive review of City’s transportation infrastructures to provide municipal engineers and planners with critical information to support the development of growth management policy. Council and key municipal departments played an integral role as the project proceeded.  The engineering team addressed […]

May 15th, 2014

Maitland Ave Bridge Rehabilation Functional Design / Planning Study (Ottawa, ON)

Project The objective of this functional design / planning study was to ascertain the most appropriate strategy for rehabilitating the Maitland Avenue Bridge over Highway 417.  The strategy was to take into account future impacts such as the advent of Highway 416, the future widening of Highway 417 and the potential to achieve other improvements […]

May 14th, 2014

Peer Review – Ontario St and Place d’Armes Intersection (Kingston, ON)

Project Castleglenn Consultants Inc. was retained by the City of Kingston to review and analyze various concepts for the major gateway Place D’Armes / Ontario St intersection into the City of Kingston. Castleglenn proposed various suggestions to improve the proposed intersection and developed a concept based on the following criteria: Pedestrian crossing; Heavy vehicles movements; Lane […]

May 14th, 2014

Origin-Destination Study and Travel Pattern Study (Timmins, ON)

Project CastleGlenn Consultants Inc. was retained by the City of Timmins and Ministry of Transportation of Ontario (MTO) to undertake a Travel Pattern Survey to achieve the following objectives: Determine the proportion and composition (vehicle type) of existing traffic that, if constructed, would likely use a by-pass of the urban area of the City of […]

May 14th, 2014

Bridge St Senior Residence Development Traffic Impact Brief (Manotick, ON)

Project Castleglenn Consultants Inc. was retained by Junicon Homes to prepare a Traffic Impact Brief (TIB) that would address the transportation and traffic issues related to a development application supporting a senior residence on Bridge Street within the Village of Manotick, located south of Ottawa. The proposed development would be located within the north-west corner […]

May 14th, 2014

Wendover Transportation Master Plan (Wendover, ON)

Project Castleglenn Consultants was retained to create a Transportation Master Plan (TMP) for the Village of Wendover, located east of Rockland within the Township of Alfred-Plantagenet. The purpose of the TMP was to investigate the current and future circulation of traffic within the Village of Wendover. This study was conducted in anticipation of the completion […]

May 14th, 2014

One-Way Street Study in Downtown Timmins (Timmins, ON)

Project Castleglenn Consultants Inc. was retained by the City of Timmins to provide an assessment of the existing traffic operations in the downtown core. Additionally, two roadway network options were to be presented, all of which incorporate an evaluation of a BIA proposed weekend summer closure of Third Ave (between Cedar St and Spruce St). […]

May 7th, 2014

Proposed Avalon West Community Development Transportation Brief (Ottawa, ON)

Project CastleGlenn Consultants Inc. was retained by Minto to address the traffic and transportation issues associated with the proposed Avalon West Community Development. The site is bordered by Tenth Line Road to the east, the proposed East Transitway to the north and Mer Bleue to the west. The development plans envisions the Avalon West Community […]

May 7th, 2014

HWY 28A/28 – Functional Planning Study (Gibbons, AB)

Project This Functional Planning study was to address the ultimate interchange location(s) and requirements in keeping with AIT’s “Best Practice Guidelines for Freeways” taking into account local circulation and land use considerations of the Town of Gibbons/Highway 643 corridor (including provisions for over-dimension vehicle traffic flow) and those measures necessary to address the right-of-way requirements […]