On-Site Circulation

May 14th, 2014

Morrisburg Village Plaza Parking Assessment (Morrisburg, ON)

Project Castleglenn Consultants Inc. was retained by the Township of South Dundas to conduct a Parking Study to address concerns related to circulation within the parking lot serving the Morrisburg Village Plaza located on the south-east quadrant of the Ottawa Street / Highway 2 intersection. The Morrisburg Village Plaza consists of two buildings with a […]

May 14th, 2014

Brookdale Mall Scotiabank Retail Development (Cornwall, ON)

Project The Bank of Nova Scotia retained CastleGlenn Consultants to investigate the feasibility of implementing a double-drive-through ATM for the Brookdale Mall, in Cornwall, Ontario.  The assessment dealt with: A potential discrepancy between the architects drawing files and existing conditions; The required width to accommodate dual ATM operation; Conformance to the City of Cornwall Zoning […]

May 7th, 2014

Riverside Hospital Parking Expansion (Ottawa, ON)

Project Castleglenn Consultants Inc. was retained by The Ottawa Hospital to address the traffic and transportation issues associated with the proposed Riverside Hospital Parking Expansion. Services Traffic survey, traffic forecasting and analysis, intersection capacity analysis and parking assessment. Role & Responsibility Prime Consultant Client The Ottawa Hospital

May 7th, 2014

HWY 63 – Combined Median Facility (Charron Lake, AB)

Project Castleglenn Consultants Inc. was retained in December 2009 to undertake consulting engineering services to evaluate, assess, and recommend a design and preferred location for a combined vehicle inspections station, truck staging area and truck safety rest area within the centre median of the Highway 63 corridor. The iterative design process involved an evaluation and […]