Traffic Control Plans

May 15th, 2014

Macdonald Cartier Bridge Detailed Traffic Control Plans (Ottawa, ON)

Project Castleglenn Consultants was retained to develop a traffic management strategy and traffic control plans to safely accommodate motorists and work personnel during the replacement of the asphalt surface and concrete repairs undertaken on the Macdonald Cartier Bridge. The 6 lane, 700m long bridge structure is a major corridor connecting the province of Quebec and […]

May 14th, 2014

Merivale Rd Traffic Control Plans (Ottawa, ON)

Project Castleglenn Consultants Inc. was retained by Bradley-Kelly Construction Ltd. to produce detailed Traffic Control Plans required for the replacement of a Bell underground utility structure on Merivale Rd (north of Family Brown Ln). The project consisted of: The closure of the outside southbound Merivale lane and a reduction of two through lanes that had […]

May 7th, 2014

Woodroffe Avenue Reconstruction Traffic Control Plans (Ottawa, ON)

Project Castleglenn Consultants Inc., in associate with J.L. Richards and Associates Ltd. were retained by the City of Ottawa to produce detailed Traffic Control Plans (TCP) required for the watermain replacement and the reconstruction of Woodroffe Avenue, between Highway 417 and Baseline Road. The project consisted of: A detailed analysis of traffic operations under multiple […]

May 7th, 2014

Prince of Wales Culvert Replacement (Ottawa, ON)

Project CastleGlenn Consultants Inc., in associate with J.L. Richards and Associates Ltd. were retained by the City of Ottawa to produce detailed Traffic Control Plans (TCP) required for the renewal of two bridge culverts located along Prince of Wales Drive about 0.55 km south of Merivale Road (SN117600) and (SN117640) located 0.15 km south of […]