Project Castleglenn Consultants was retained by Alberta Transportation to assist with a public involvement program used to unite public support regarding the recommended improvements to the Highway 2 Gaetz Avenue interchange and Gasoline Alley corridor. CastleGlenn consultants undertook the following tasks: Review of the functional plans proposed by AECOM for the section of Highway 2 between the […]
Road Safety Audit
Maitland Ave Bridge Rehabilation Functional Design / Planning Study (Ottawa, ON)
Project The objective of this functional design / planning study was to ascertain the most appropriate strategy for rehabilitating the Maitland Avenue Bridge over Highway 417. The strategy was to take into account future impacts such as the advent of Highway 416, the future widening of Highway 417 and the potential to achieve other improvements […]
HWY 22X – Functional Planning Study (Indus, AB)
Project CastleGlenn Consultants was retained by Alberta Transportation to conduct the Highway 22X/Highway 791 Functional Planning Study for a section of Highway 22X between the East Calgary Freeway and Range Road 273. This study addressed the “ultimate” requirements of the Highway 22X corridor including the preferred Highway 22X twinned alignment, provision for an 8-lane cross-section […]