Project Castleglenn Consultants Inc. was retained by DCR Phoenix Development Corp. Ltd. to provide an assessment of the operation of the proposed residential development located on the north-east quadrant of the Greenbank Road / Craig Henry Drive intersection. These lands were intended to be re-developed to accommodate two residential buildings comprised of 72 units. The […]
Parking
One-Way Street Study in Downtown Timmins (Timmins, ON)
Project Castleglenn Consultants Inc. was retained by the City of Timmins to provide an assessment of the existing traffic operations in the downtown core. Additionally, two roadway network options were to be presented, all of which incorporate an evaluation of a BIA proposed weekend summer closure of Third Ave (between Cedar St and Spruce St). […]
770 Somerset St Development Transportation Impact Assessment (Ottawa, ON)
Project CastleGlenn Consultants Inc. was retained by DCR Phoenix Development Corp. Ltd. to provide an assessment of the traffic issues concerning the re-development of the surface parking lot located on the south-east quadrant of the Somerset St / Lebreton St intersection. It was understood that the land is intended to be developed to accommodate a […]
Riverside Hospital Parking Expansion (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained by The Ottawa Hospital to address the traffic and transportation issues associated with the proposed Riverside Hospital Parking Expansion. Services Traffic survey, traffic forecasting and analysis, intersection capacity analysis and parking assessment. Role & Responsibility Prime Consultant Client The Ottawa Hospital
The Ottawa Hospital General Campus (Ottawa, ON)
Project Castleglenn Consultants was retained to determine the traffic impacts and the parking requirements associated with the major expansions of The Ottawa Hospital facilities including: the Ottawa Regional Cancer Centre; the Critical Care Tower; the Eye Institute; the Regional Lab; the Ottawa Hospital Research Institute (OHRI); the Ottawa Regional Cancer Centre shell; the Children’s Hospital […]
Parking Lot Development Traffic Impact Study (3030 23rd St NE, Calgary, AB)
Project Castleglenn Consultants were retained by Triumph Properties Ltd. to address the traffic and transportation issues related to the proposed parking lot development located at 3030 – 23rd Street north-east in the City of Calgary. The site plan contained a single parking lot facility with a total of 284 parking stalls located within the southeast […]