Public Involvement

June 2nd, 2014

HWY 2 – Gaetz Avenue Interchange Public Involvement Program (Red Deer, AB)

Project Castleglenn Consultants was retained by Alberta Transportation to assist with a public involvement program used to unite public support regarding the recommended improvements to the Highway 2 Gaetz Avenue interchange and Gasoline Alley corridor. CastleGlenn consultants undertook the following tasks: Review of the functional plans proposed by AECOM for the section of Highway 2 between the […]

May 14th, 2014

Origin-Destination Study and Travel Pattern Study (Timmins, ON)

Project CastleGlenn Consultants Inc. was retained by the City of Timmins and Ministry of Transportation of Ontario (MTO) to undertake a Travel Pattern Survey to achieve the following objectives: Determine the proportion and composition (vehicle type) of existing traffic that, if constructed, would likely use a by-pass of the urban area of the City of […]

May 7th, 2014

HWY 28A/28 – Functional Planning Study (Gibbons, AB)

Project This Functional Planning study was to address the ultimate interchange location(s) and requirements in keeping with AIT’s “Best Practice Guidelines for Freeways” taking into account local circulation and land use considerations of the Town of Gibbons/Highway 643 corridor (including provisions for over-dimension vehicle traffic flow) and those measures necessary to address the right-of-way requirements […]

May 7th, 2014

HWY 855 – Alignment Functional Planning study (Athabasca, AB)

Project Alberta Transportation had initiated a functional planning study in 2009 to address the requirements of the Highway 855:24 corridor (30km in length) between Highway 663 (Caslan) and Highway 55 (Atmore).  The functional plan evaluated alternative Highway 855 alignment options and recommended future improvements. The existing Highway 855 corridor does not meet minimum highway design […]

May 7th, 2014

HWY 783 – Functional Planning Study (Okotoks, AB)

Project Castleglenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would address the “ultimate” requirements of a 3.2km section of Highway 783 beginning south of Highway 7 (in the vicinity of the Town of Okotoks).  The primary objectives of this planning study were to identify the preferred alignment and […]

May 7th, 2014

HWY 27 – Functional Planning Study (Olds, AB)

Project Castleglenn Consultants was retained by Alberta Transportation to conduct the Highway 27 Functional Planning Study. This study addressed the “ultimate” requirements of the Highway 27 corridor in the vicinity of the Town of Olds. Phase I: Corridor Planning focused on identifying a preferred interchange location along the Highway 2 corridor and identifying, reviewing and […]

May 7th, 2014

HWY 43 – Functional Planning Study (Onoway, AB)

Project Alberta Transportation retained Castleglenn Consultants to conduct a study of Highway 43:22 to address the “ultimate” freeway requirements for a 23 km segment of Highway 43 and identify the configuration and location of future interchanges along the corridor. The proposed improvements were designed in accordance with AT’s “Best Practice For Planning and Design of […]

March 5th, 2014

HWY 22X – Functional Planning Study (Indus, AB)

Project CastleGlenn Consultants was retained by Alberta Transportation to conduct the Highway 22X/Highway 791 Functional Planning Study for a section of Highway 22X between the East Calgary Freeway and Range Road 273.  This study addressed the “ultimate” requirements of the Highway 22X corridor including the preferred Highway 22X twinned alignment, provision for an 8-lane cross-section […]

March 5th, 2014

HWY 1 – Springbank Interchange Functional Planning Study (Calgary, AB)

Project CastleGlenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would determine the “ultimate” configuration of the Highway 1/Range Road 33 interchange and confirm the access management strategy for Range Road 33 (between Twp Rd 250 and Twp Rd 245). The planning study was initiated in response to a […]