Twinning & Interchanges

May 15th, 2014

Maitland Ave Bridge Rehabilation Functional Design / Planning Study (Ottawa, ON)

Project The objective of this functional design / planning study was to ascertain the most appropriate strategy for rehabilitating the Maitland Avenue Bridge over Highway 417.  The strategy was to take into account future impacts such as the advent of Highway 416, the future widening of Highway 417 and the potential to achieve other improvements […]

May 7th, 2014

HWY 28A/28 – Functional Planning Study (Gibbons, AB)

Project This Functional Planning study was to address the ultimate interchange location(s) and requirements in keeping with AIT’s “Best Practice Guidelines for Freeways” taking into account local circulation and land use considerations of the Town of Gibbons/Highway 643 corridor (including provisions for over-dimension vehicle traffic flow) and those measures necessary to address the right-of-way requirements […]

May 7th, 2014

HWY 783 – Functional Planning Study (Okotoks, AB)

Project Castleglenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would address the “ultimate” requirements of a 3.2km section of Highway 783 beginning south of Highway 7 (in the vicinity of the Town of Okotoks).  The primary objectives of this planning study were to identify the preferred alignment and […]

May 7th, 2014

HWY 27 – Functional Planning Study (Olds, AB)

Project Castleglenn Consultants was retained by Alberta Transportation to conduct the Highway 27 Functional Planning Study. This study addressed the “ultimate” requirements of the Highway 27 corridor in the vicinity of the Town of Olds. Phase I: Corridor Planning focused on identifying a preferred interchange location along the Highway 2 corridor and identifying, reviewing and […]

May 7th, 2014

HWY 43 – Functional Planning Study (Onoway, AB)

Project Alberta Transportation retained Castleglenn Consultants to conduct a study of Highway 43:22 to address the “ultimate” freeway requirements for a 23 km segment of Highway 43 and identify the configuration and location of future interchanges along the corridor. The proposed improvements were designed in accordance with AT’s “Best Practice For Planning and Design of […]

March 5th, 2014

HWY 22X – Functional Planning Study (Indus, AB)

Project CastleGlenn Consultants was retained by Alberta Transportation to conduct the Highway 22X/Highway 791 Functional Planning Study for a section of Highway 22X between the East Calgary Freeway and Range Road 273.  This study addressed the “ultimate” requirements of the Highway 22X corridor including the preferred Highway 22X twinned alignment, provision for an 8-lane cross-section […]

March 5th, 2014

HWY 1 – Springbank Interchange Functional Planning Study (Calgary, AB)

Project CastleGlenn Consultants Inc. was retained in December 2008 to undertake a functional planning study that would determine the “ultimate” configuration of the Highway 1/Range Road 33 interchange and confirm the access management strategy for Range Road 33 (between Twp Rd 250 and Twp Rd 245). The planning study was initiated in response to a […]