Ontario

January 29th, 2015

145 Spruce Street Parking Assessment

Project CastleGlenn Consultants Inc. was retained by Colliers International to evaluate the adequacy of the existing parking supply serving 145 Spruce Street and 160-thru-168 Elm Street. The City of Ottawa had maintained that to bring the existing building use in conformance with current zoning by-laws, the existing supply of parking was deficient and that an […]

July 14th, 2014

Malyon Court Subdivision Traffic Evaluation and Assessment (Cornwall, ON)

Project Castleglenn services involved undertaking a comprehensive traffic evaluation and assessment of the proposed draft plan of a subdivision known as Malyon Court taking into account current design standards, guidelines and practices and preparing  such findings and conclusions for review by the Ontario Municipal Board. The City of Cornwall passed two re-classification by-laws (By-law No. […]

May 15th, 2014

Infrastructure Needs Background and Sustainable Community Planning Study – Transportation Component (North Bay, ON)

Project Castleglenn Consultants Inc. was retained by the City of North Bay to undertake a comprehensive review of City’s transportation infrastructures to provide municipal engineers and planners with critical information to support the development of growth management policy. Council and key municipal departments played an integral role as the project proceeded.  The engineering team addressed […]

May 15th, 2014

Block “D” Development Peer Review (Kingston, ON)

Project Castleglenn Consultants was retained to review various initiatives concerning the development of lands known as Block “D” within the City of Kingston. The concerns raised by the City of Kingston‘s Engineering Division included: providing an assessment of the projected traffic volumes, the degree of acceptability concerning the concept of shared parking between office and […]

May 14th, 2014

Peer Review – Ontario St and Place d’Armes Intersection (Kingston, ON)

Project Castleglenn Consultants Inc. was retained by the City of Kingston to review and analyze various concepts for the major gateway Place D’Armes / Ontario St intersection into the City of Kingston. Castleglenn proposed various suggestions to improve the proposed intersection and developed a concept based on the following criteria: Pedestrian crossing; Heavy vehicles movements; Lane […]

May 14th, 2014

Town of Arnprior Master Traffic Study (Arnprior, ON)

Project Castleglenn Consultants Inc. was retained in 2007 to undertake a Master Traffic Study on behalf of the Town of Arnprior.  The study was commenced to provide the Town of Arnprior Council with a strategic plan that would identify future infrastructure requirements associated with proposed residential, industrial, and commercial growth planned for the community.  The […]

May 14th, 2014

Origin-Destination Study and Travel Pattern Study (Timmins, ON)

Project CastleGlenn Consultants Inc. was retained by the City of Timmins and Ministry of Transportation of Ontario (MTO) to undertake a Travel Pattern Survey to achieve the following objectives: Determine the proportion and composition (vehicle type) of existing traffic that, if constructed, would likely use a by-pass of the urban area of the City of […]

May 14th, 2014

Wendover Transportation Master Plan (Wendover, ON)

Project Castleglenn Consultants was retained to create a Transportation Master Plan (TMP) for the Village of Wendover, located east of Rockland within the Township of Alfred-Plantagenet. The purpose of the TMP was to investigate the current and future circulation of traffic within the Village of Wendover. This study was conducted in anticipation of the completion […]

May 14th, 2014

Highland Park Subdivision Traffic Impact Study (Petawawa, ON)

Project CastleGlenn Consultants Inc. was retained by the County of Renfrew to address the traffic related draft conditions of the final plan approval of Phase four and five of the Highland Park Subdivision. The Highland Park Subdivision development is located along the south side of Civic Centre Road between Petawawa Bld and Laurentian Drive. Phase […]

May 14th, 2014

Morrisburg Village Plaza Parking Assessment (Morrisburg, ON)

Project Castleglenn Consultants Inc. was retained by the Township of South Dundas to conduct a Parking Study to address concerns related to circulation within the parking lot serving the Morrisburg Village Plaza located on the south-east quadrant of the Ottawa Street / Highway 2 intersection. The Morrisburg Village Plaza consists of two buildings with a […]