Project CastleGlenn Consultants Inc. was retained by Colliers International to evaluate the adequacy of the existing parking supply serving 145 Spruce Street and 160-thru-168 Elm Street. The City of Ottawa had maintained that to bring the existing building use in conformance with current zoning by-laws, the existing supply of parking was deficient and that an […]
Ottawa
Maitland Ave Bridge Rehabilation Functional Design / Planning Study (Ottawa, ON)
Project The objective of this functional design / planning study was to ascertain the most appropriate strategy for rehabilitating the Maitland Avenue Bridge over Highway 417. The strategy was to take into account future impacts such as the advent of Highway 416, the future widening of Highway 417 and the potential to achieve other improvements […]
Macdonald Cartier Bridge Detailed Traffic Control Plans (Ottawa, ON)
Project Castleglenn Consultants was retained to develop a traffic management strategy and traffic control plans to safely accommodate motorists and work personnel during the replacement of the asphalt surface and concrete repairs undertaken on the Macdonald Cartier Bridge. The 6 lane, 700m long bridge structure is a major corridor connecting the province of Quebec and […]
Hawthorne Business Park Transportation Impact Brief Peer Review (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained by the Ottawa Hawthorne Business Park Association to provide a peer review of a Transportation Brief that addressed a proposed Storage Facility to be located within the south-west quadrant of the Walkley Rd / Hawthorne Rd intersection. The intent of the review was to provide a professional opinion regarding […]
747 Richmond Rd Ontario Municipal Board Hearing Traffic Impact Study (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained to prepare a defense for the proposed 747 Richmond Rd development that would require an update to the original traffic impact study submitted Oct. 2005 and provide professional opinion and expert witness testimony, if required, at an Ontario Municipal Board hearing. The original traffic impact study assumed for analysis […]
Merivale Rd Traffic Control Plans (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained by Bradley-Kelly Construction Ltd. to produce detailed Traffic Control Plans required for the replacement of a Bell underground utility structure on Merivale Rd (north of Family Brown Ln). The project consisted of: The closure of the outside southbound Merivale lane and a reduction of two through lanes that had […]
310 Stonehaven Dr OMB Hearing Traffic Evaluation and Assessment (Ottawa, ON)
Project Castleglenn Consultants was retained by the City of Ottawa to prepare a technical memorandum for the purpose of defending Council’s position of establishing a “holding zone” until such time as a “transportation solution is found and implemented to the City’s satisfaction that improves the intersection of Stonehaven Drive and Richmond Road, and the Stonehaven […]
Bridge St Senior Residence Development Traffic Impact Brief (Manotick, ON)
Project Castleglenn Consultants Inc. was retained by Junicon Homes to prepare a Traffic Impact Brief (TIB) that would address the transportation and traffic issues related to a development application supporting a senior residence on Bridge Street within the Village of Manotick, located south of Ottawa. The proposed development would be located within the north-west corner […]
Miss Ottawa Commercial Development Traffic Impact Brief (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained by Richcraft Ltd to prepare a Traffic Brief (TB) to address 42 residential stacked townhouses located on the south-east quadrant of the Montreal Road / Miss Ottawa intersection. The proposed development resulted in negligible change to the traffic patterns and level of service at the Montreal Road / Miss […]
Costco Gas Bar and Parking Lot Expansion Traffic Impact Brief (Ottawa, ON)
Project Castleglenn Consultants Inc. was retained by Costco Corporation to prepare a Traffic Impact Brief (TIB) that would address the transportation and traffic issues in relation to a development application supporting the proposed Costco Gas Bar. The TIB was required to comply with the City of Ottawa’s “Transportation Assessment Guidelines” (October 2006).The proposed development is […]